Why choose FlowMax Gold?
Here are the key factors
why several Central
Vacuum OEM?s have
made FlowMax Gold
their only vacuum
pipe of choice and why
it is the best vacuum
tubing on the market?
High-Quality Material
FlowMax Gold vacuum tubing is produced only from 100% virgin
PVC material. We use
no recycled material
or ground-up plastic
of any type in FlowMax
Gold vacuum tubing. This
recycled material basically
comes from discarded plastic
products or scrap that is
gathered together, ground
up, reheated, and re-extruded into
vacuum pipe. Scrap material
typically varies from
lot to lot depending
on what has been ground up. The
nature of scrap makes it hard
to keep out foreign materials.
Because of this, reused
plastic often contains foreign
materials like metal, stone or
other non-PVC plastic materials
that can cause poor
glue adhesion, holes, tears,
rough inside surfaces, inconsistent
wall thicknesses, out-of-spec
diameters, or easily
cracked pipe.
Don't Blame the Cement
If
you've ever had a vacuum
pipe joint leak or had
a joint come completely apart,
it may be the fault of the
pipe. PVC cement works
by "melting" the
PVC in the pipe and fittings,
but it isn't formulated to "melt" any
of the foreign materials
like metal, stone, or other
non-PVC plastic materials
that may end up in the pipe.
Because we use only 100%
pure virgin PVC and have
no foreign materials, our
entire vacuum pipe surface
is working to lock and seal
the pipe to the fittings.
Also, if your vacuum pipe
is undersized in outside
diameter, an oversized gap
is formed between the pipe
and fitting. Since PVC cement
is not designed to bridge
oversized gaps, the joint
quality is compromised. Because
of the tight outside diameter
control on our FlowMax Gold
vacuum pipe, you consistently
get the optimum glue gap
for a tight joint.
|
Easier and Faster Installation
FlowMax
Gold vacuum pipe is manufactured
to rigorous standards to
ensure part to part consistency.
Better cuts, consistent fit
to fittings, and superior
cement adhesion let you get
the installation done right
(and quickly) the first time every
time. Sorting pipe at the
job site, having to cut out
bad sections, or in the worst
case, getting a callback
to the job site of a finished
home where finished walls
must be torn apart to
find a leak, all rob you
of your time and profit.
Superior Fit to Fittings
Have you ever had a problem with your fittings being too
loose or falling off
the pipe? Have you ever
had to hammer a fitting
on to the end of a
pipe? If so, youve
probably been seeing
the effects of bad or
inconsistent pipe outside
diameter. Using our proprietary,
outside diameter production
control technology, we
have remarkable control
on the outside diameter
of our FlowMax Gold vacuum
pipe. This means a superior and very consistent fit.
Excellent Value
Even with all of these added features and benefits, FlowMax
Gold vacuum pipe costs
only slightly more per
foot, but we are probably
one of your best real values.
Even at 2 cents more
per foot, on a house
that uses 150 feet of
vacuum tubing, the cost
would only be $3.00 more for the entire
house. A couple of saved
recuts, re-glues, or
callbacks are more than
enough to easily pay for this. Also, several dealers
and installers have expressed
fears of pipe or joint
failure in the future
causing them a future liability. Peace of mind is worth
a lot.
|